Scada Configuration on 20kv Distribution Network in Central Java and Yogyakarta Special Region using ROPO, IDAS, and "Survalent"

Authors

  • Bambang Winardi Department of Electrical Engineering, Diponegoro University, Semarang, Indonesia Author
  • Enda Wista Sinuraya Department of Electrical Engineering, Diponegoro University, Semarang, Indonesia Author
  • Yosua Alvin Adi Soetrisno Department of Electrical Engineering, Diponegoro University, Semarang, Indonesia Author

Keywords:

Configuration, SCADA, Distribution

Abstract

Like other SCADA systems in Central Java & DIY APD, there  are three main SCADA implementation pillars: Master Station,  Remote Terminal Unit, and Telecommunications. The Master  Station functions to manage the SCADA software and its  operational display. The remote Terminal Unit is an executor  device to control and retrieve the status of Electric Power  Distribution equipment. Meanwhile, Telecommunications is in  charge of managing communication to connect the results of the  Remote Terminal Unit with the Master Station. To optimize all three and improve the reliability of electricity  distribution PT. PLN (Persero) Distribution Control Area (APD in  Indonesian) Central Java and DIY changed the current SCADA  configuration (still separate in each region) into a centralized and  well-organized future structure. The stages of realizing the plan  include: setting up the SCADA master configuration, namely  ROPO, IDAS, and "Survalent"; Building a backup server (Quad  Redundant Server); and embodying the concept of 3 DCC. 

Downloads

Download data is not yet available.

References

SPLN S6.001: 2008 Planning and Development of SCADA System

SPLN S3.001: 2008 Electric Power System SCADA Equipment

SCADATEL Roadmap PT. PLN (Persero) APD Central Java & DIY : 2011

PT. PLN (Persero) SCADA Overview

PT. PLN (Persero) Master Station

PT. PLN (Persero) Remote Terminal Unit

PT. PLN (Persero) Operation and Maintenance of SCADA System

PT. PLN (Persero) SCADA System Planning and Development

PT. PLN (Persero) Telecommunication Electric Power System

Pratiwi, Helyani. 2010. Evaluation of IDAS Performance in Troubleshooting. Staff Review.

Downloads

Published

2021-11-30

How to Cite

Scada Configuration on 20kv Distribution Network in Central Java and Yogyakarta Special Region using ROPO, IDAS, and "Survalent". (2021). International Journal of Innovative Research in Engineering & Management, 8(6), 22–24. Retrieved from https://acspublisher.com/journals/index.php/ijirem/article/view/11462