Project Management of an Automotive Industrial Building Using MS Project and Primavera

Authors

  • Rasikh Riyaz Research Scholar, Department of Civil Engineering, RIMT University, Gobindgarh, Punjab, India Author
  • Anuj Sachar Assistant Professor, Department of Civil Engineering, RIMT University, Gobindgarh, Punjab, India Author
  • Sandeep Singla Professor, Department of Civil Engineering, RIMT University, Gobindgarh, Punjab, India Author

Keywords:

Planning, Scheduling, Project Management, Microsoft Project, Duration, Primavera

Abstract

For successful completion of a project two  most important factors are planning and scheduling. The  construction industry requires precise planning and  management that can help completing a project on given  timelines and allow for the full implementation of  controlled cost, time and resources. Due to increasing  workloads and declining resources the construction  management industry has acquired new technologies that  help to manage and organize the project more easily. The  Project management software is used as a management and  planning tool that helps industries grow faster. There are  various software available in the market like Microsoft  Project, Primavera P6, etc. Good planning and project  management may be done with the help of these tools.  Primavera makes it simple to compare the projected  progress of construction work with the actual progress of  construction activity. Primavera P6, includes recording,  collection, monitoring, managing and reporting project related information. In this study project management and  monitoring can be done and the causes of delays can be  identified. 

Downloads

Download data is not yet available.

References

Raiyan Abdul Rashid Mansoori(2016), “ Application of Primavera & GIS for Effective Project Management,” International Journal of Engineering Research, Volume No.5,pp(140-142).

Dubeiy Anuj (2016), “Earned Value Analysis For a Construction Project Management”, (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316, Volume 6, Issue 6

B. S. K. Reddy, SK. Nagaraju, Md. Salman(2015), “A Study On Optimisation of Resources for Multiple Projects by Using Primavera” Journal of Engineering Science and Technology,Vol.10

Magdalene Benila ,R Esakki Thangam P, (2015), “Planning, Scheduling and Time Management of Six Lanes Road Construction Work at V.O.C Port Trust using Primavera P6

Software”, (IJSTE), ISSN (online): 2349-784X, Volume 2, Issue 11

Dixit R K , Verma Ankur, Pathak K K, Dixit R K (2015), “Earned Value Analysis of Construction Project at Rashtriya Sanskrit Sansthan, Bhopal”, (IJIRSET), ISSN: 2319-8753, Vol. 3, Issue 4

Pethe Sarang S, Pramila Adavi(2012),” Application Of PRIMAVERA In Construction Industry,” International Journal of Advanced Technology in Civil Engineering, Volume-1, pp( 16-17)

Vijay K, Rajendra S Mohammed ,Zaki Haider, (2014), “Planning Scheduling, Tracking And Application Administration Using Primavera Web Logic P6”, (IJRET), p ISSN: 2321-7308, Volume: 05, Issue: 07

Robichaud, L. B., & Anantatmula, V. S. (2010), Greening project management practices for sustainable

construction. Journal of Management in Engineering, 27(1), 48-57

James P. Lewis (2000), the project manager's desk reference: a comprehensive guide to project planning,

scheduling, evaluation, and systems. Pp.185-256.