Project Management of an Automotive Industrial Building Using MS Project and Primavera
Keywords:
Planning, Scheduling, Project Management, Microsoft Project, Duration, PrimaveraAbstract
For successful completion of a project two most important factors are planning and scheduling. The construction industry requires precise planning and management that can help completing a project on given timelines and allow for the full implementation of controlled cost, time and resources. Due to increasing workloads and declining resources the construction management industry has acquired new technologies that help to manage and organize the project more easily. The Project management software is used as a management and planning tool that helps industries grow faster. There are various software available in the market like Microsoft Project, Primavera P6, etc. Good planning and project management may be done with the help of these tools. Primavera makes it simple to compare the projected progress of construction work with the actual progress of construction activity. Primavera P6, includes recording, collection, monitoring, managing and reporting project related information. In this study project management and monitoring can be done and the causes of delays can be identified.
Downloads
References
Raiyan Abdul Rashid Mansoori(2016), “ Application of Primavera & GIS for Effective Project Management,” International Journal of Engineering Research, Volume No.5,pp(140-142).
Dubeiy Anuj (2016), “Earned Value Analysis For a Construction Project Management”, (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316, Volume 6, Issue 6
B. S. K. Reddy, SK. Nagaraju, Md. Salman(2015), “A Study On Optimisation of Resources for Multiple Projects by Using Primavera” Journal of Engineering Science and Technology,Vol.10
Magdalene Benila ,R Esakki Thangam P, (2015), “Planning, Scheduling and Time Management of Six Lanes Road Construction Work at V.O.C Port Trust using Primavera P6
Software”, (IJSTE), ISSN (online): 2349-784X, Volume 2, Issue 11
Dixit R K , Verma Ankur, Pathak K K, Dixit R K (2015), “Earned Value Analysis of Construction Project at Rashtriya Sanskrit Sansthan, Bhopal”, (IJIRSET), ISSN: 2319-8753, Vol. 3, Issue 4
Pethe Sarang S, Pramila Adavi(2012),” Application Of PRIMAVERA In Construction Industry,” International Journal of Advanced Technology in Civil Engineering, Volume-1, pp( 16-17)
Vijay K, Rajendra S Mohammed ,Zaki Haider, (2014), “Planning Scheduling, Tracking And Application Administration Using Primavera Web Logic P6”, (IJRET), p ISSN: 2321-7308, Volume: 05, Issue: 07
Robichaud, L. B., & Anantatmula, V. S. (2010), Greening project management practices for sustainable
construction. Journal of Management in Engineering, 27(1), 48-57
James P. Lewis (2000), the project manager's desk reference: a comprehensive guide to project planning,
scheduling, evaluation, and systems. Pp.185-256.