Time and Motion Study of Cutting Tool Production: Process Charts and Layouts (I)

Authors

  • Sukwon Kim Department of Physical Education, Chonbuk National University, Jeonju, South Korea, Author

Keywords:

Time, motion, lean, layout, idle

Abstract

A manufacturing company should use its  resources (i.e., manpower, machinery, and so on) in an  efficient manner to improve productivity and minimize cost. The purpose of the present study was to  recommend improvement methodologies for production  in a company that designed a cutting tool to be installed 

on the bottom of a boring machine. To produce the  cutting tool, the company has used traditional  technology that has resulted in a lengthy processing  time and a delay in supplying the finished goods to the  vendors. This article 1) described how the process was adopted by the organization. 

Downloads

Download data is not yet available.

References

Aft, L. S. (2000). Work measurement and methods improvement (Engineering design and automation). 3rded.69-79. New York: Wiley Series in Engineering Design and Automation.

2Alsyouf, I. (2007). The role of maintenance in improving companies’ productivity and profitability. International Journal of Production Economics, 105(1), 70-78.

Genaidy, A. and Karwowski, W. (2003). Human Performance in Lean Production Environment: Critical assessment and Research Framework. Human Factors and Ergonomics in Manufacturing, 13(4), 317-330.

Freivalds A. and Niebel B. (2009). Niebel’s Methods, standards and work design. 12th edition. New York, NY 10020: McGraw-Hill Companies. Inc.

Koufteros, X.A., M.A. Vonderembse and Doll W. (1998). Developing measures of time based manufacturing. Journal of Operations Management, 16 (1), 21–41.

Landsbergis, P., Schnall, P., and Cahill, J. (1999). The impact of lean production and related new systems of work organization on worker health. Journal of Occupational Health Psychology, 4(2), 108-130.

Meller, R. and Gau K. (1996). The facility layout problem: Recent and emerging trends and perspectives, Journal of Manufacturing Systems, 15 (5),351-366. [8] Phillips, J.E. (1997). Manufacturing plant layout-fundamental and fine points of optimum facility design. (page 136). Dearborn, Michigan, 48121: Society of Manufacturing Engineers.

Plonka, F. (1997). Developing a lean and agile work force. Human Sakakibara, S., B.B. Flynn, R.G. Schroeder and Morris W.T., (1997). The impact of just-in-time manufacturing and its infrastructure on manufacturing performance. Management Science 43 (9), 1246–1257.

Freivalds A. and Niebel B. (2009). Niebel’s Methods, standards and work design. 12th edition. New York, NY 10020: McGraw-Hill Companies. Inc.

Womack, S., Armstrong, T., Liker, J. (2009). Lean job design and musculoskeletal disorder risk: A two plant comparison. Human Factors and Ergonomics in Manufacturing and Service Industries, 19(4), 279-293.

Downloads

Published

2024-02-24

How to Cite

Time and Motion Study of Cutting Tool Production: Process Charts and Layouts (I) . (2024). International Journal of Innovative Research in Computer Science & Technology, 7(3), 27–31. Retrieved from https://acspublisher.com/journals/index.php/ijircst/article/view/13221