[1]
“The Initial Process of Dam Construction is Seen from a Topographical Perspective (Bench Mark Coordinates and Control Point Coordinates): Case study of D.I. Bajayu Kab Serdang Bedagai ”, IJIRCST, vol. 11, no. 2, pp. 34–37, Mar. 2023, doi: 10.55524/ijircst.2023.11.2.7.