1.
The Initial Process of Dam Construction is Seen from a Topographical Perspective (Bench Mark Coordinates and Control Point Coordinates): Case study of D.I. Bajayu Kab Serdang Bedagai . IJIRCST. 2023;11(2):34-37. doi:10.55524/ijircst.2023.11.2.7