(1)
The Initial Process of Dam Construction Is Seen from a Topographical Perspective (Bench Mark Coordinates and Control Point Coordinates): Case Study of D.I. Bajayu Kab Serdang Bedagai . IJIRCST 2023, 11 (2), 34-37. https://doi.org/10.55524/ijircst.2023.11.2.7.