Time and Motion Study of Cutting Tool Production: Recommended Changes & Block Layout (II)
Keywords:
method engineering, lean, layout, worker-machine relationship, idle timeAbstract
The purpose of this study was to recommend improvement methodologies for production in a company that designed a cutting tool to be installed on the bottom of a boring machine. To produce the cutting tool, the company has used traditional technology that has resulted in a lengthy processing time and a delay in supplying the finished goods to the vendors. This present study analyzed the production process by means of a worker-machine relationship chart and identified possible causes that may hinder productivity. This case study would be a good example of how methods engineering can be used to improve productivity and to minimize cost.
Downloads
References
Davy, J., R.E. White, N.J. Merritt and Gritzmacher K. (1992). A derivation of the underlying constructs of Just-In-Time management systems. Academy of Management Journal 35(3),653–670.
B.B., R.G. Schroeder and Flynn E. (1999). World class manufacturing: an investigation of Hayes and Wheelwright’s Foundation. Journal of Operations Management 17(2),249–269.
Freivalds A. and Niebel B. (2009). Niebel’s Methods, standards and work design. 12th edition. New York, NY 10020: McGraw-Hill Companies. Inc.
Koufteros, X.A., M.A. Vonderembse and Doll W. (1998). Developing measures of time based manufacturing. Journal of Operations Management, 16 (1), 21–41.
Levinson, W., Principal of Levinson Productivity Systems, P.C. Dec 2002. 10 March 2010 <http://www.ct-yankee.com/lean/toc_sfm.html#SFM>
Marek, T., & Karwowski, W. (Eds.). (2000). Manufacturing Agility and Hybrid Automation III. [7] Krakow, Poland: Jagiellonian University Press. [8] McKone, K.E., R.G. Schroeder and Cua K.O., (1999) Total productive maintenance: a contextual view. Journal of Operations Management 17 (2), 123–144. [9] Meller, R. and Gau K. (1996). The facility layout problem: Recent and emerging trends and perspectives, Journal of Manufacturing Systems, 15 (5),351-366.
Phillips, J.E. (1997). Manufacturing plant layout-fundamental and fine points of optimum facility design. (page 136). Dearborn, Michigan, 48121: Society of Manufacturing Engineers.
Radovilsky, Zinovy D. (1998). A quantitative approach to estimate the size of the time buffer in the theory of constraints. International Journal.
Rosenblatt, M.J. and Sinuany-Stern Z. (1986). A Discrete Efficient Frontier Approach to the Plant Layout Problem, Material Flow, 2(4), 277-281.
Sakakibara, S., B.B. Flynn, R.G. Schroeder and Morris W.T., (1997). The impact of just-in-time
manufacturing and its infrastructure on manufacturing performance. Management Science 43 (9), 1246–1257.
Schroeder, R.G., Flynn, B.B., (2001). High Performance Manufacturing: Global Perspectives. Wiley, New York.
Richey, D. (1996). Shingo Prize Guidelines: The Shingo Prize for excellence in manufacturing. Journal for Quality and Participation, 19(4), 28–31.
Standard, Charles and Davis D. (1999). Running Today’s Factory: A proven Strategy for Lean Manufacturing. Cincinnati, OH, Hanser Gardner Publications, 111-122.
Tompkins, J., White, J., Bozer, Y., Tanchoco J. (2010). Facilities Planning. 4th edition. Danvers, MA 01923: John Wiley & Sons, Inc.
Freivalds A. and Niebel B. (2009). Niebel’s Methods, standards and work design. 12th edition. New York, NY 10020: McGraw-Hill Companies. Inc.
White, R.E., J.N. Pearson and Wilson J.R. (1999). JIT Manufacturing: a survey of implementation in small and large US manufacturers. Management Science 45(1), 1–15.